An accurate Finish Schedule is paramount to ensuring that the build-out of a BHRC Clinic is done properly. This Finish Schedule lists out essential specifications for the floor, wall, and ceiling materials in order to communicate this important information to the construction team. By adhering to each detail outlined in this document, you can be sure that your clinic will be constructed using only the highest quality materials and built with special attention to detail. Ultimately, creating and adhering to a detailed Finish Schedule will help ensure the successful completion of your BHRC Clinic build-out.

02

Finish Schedule

03

Finish Legend

04

Inspection Tips

Whether you are performing a pre-opening inspection or one of our White Glove Inspections (WGI), these are the things you need to look for prior to approving construction completion or passing the WGI.

Interior Walls

  • Walls are painted the correct color
  • The base primer is not visible through the finished paint color
  • There are now excessive paint stroke/roller marks on the finished paint coat
  • There are no scratches, scuffs or marks on the paint

Flooring

  • tbd

Ceiling

  • tbd

Base & Trim

  • tbd